Orchestrate

The refresher nobody recorded

Break-fix drill · Production · about 5 minutes · starts after stage 11 of 11, "Pay and close the month", and the Environment, health and safety chapter up to "Test and confirm with a name" in *Name who did it* (the test bench's assessment asks for TB-OPS at TEST1; two ES-200 on an order by hand, assembly confirmed by 00100188, the pressure test waiting)

What the user reports

Monday 21 December at Rockford. The two pumps for stock are assembled and the test technician has just finished their pressure test. He did his test bench refresher last Thursday and went straight back to the bench. When he confirms the test with his own number, the Dispatch list refuses it, and the supervisor wants the pumps received before lunch.

The error: Confirmation refused at TEST1: 00100196 may not be named on 0020 Pressure test: TEST1 needs TB-OPS, and 00100196 ran out yesterday.

What you'll do

  1. See the problem as the shop floor operator: On Dispatch list, at TEST1, Start and Finish operation 0020 on the order for 2 ES-200, shift 1, and confirm it with Done by 00100196 (the test technician).
  2. Find the cause: He did the refresher four days ago. Why is the confirmation still refused?
  3. Fix it as the safety manager.
  4. Prove it: run the step that failed again.

Start the drill

The drill runs in the lab on its own prepared copy of the fictional Calder Pumpworks, saved in this browser apart from your company. All codes and values are fictional course labels.

Answer and explanation (open after the drill)

The fix: The check reads the training record, and 00100196's TB-OPS record still ends yesterday: the refresher happened, but nobody recorded it, so on paper he is untrained today.

The check is a lookup of the training record on today's date, not of what happened at a course. The refresher is real, but until the record says so the rule can't see it. The assessment is approved and still asks for TB-OPS; nothing waits a day, and the supervisor has no special right to confirm work.

Why it broke

The refresher was booked in time and taken in time. The certificate came back by email and waited for the safety manager to type it in, and the old record ended the day after. The rule did its job: it can only see the record.

How teams prevent it

Record a refresher from its certificate on the day, and watch the records that run out in the next 30 days so the course and the record both land before the end date. Booking the refresher a month early leaves room for the paperwork.

Across teams

The safety manager owns the records, the training provider issues the certificate, the technician took the course, and the production supervisor has two pumps that can't be received. One record update stands between all of them.

Where AI fits

A model can read the certificate when it arrives and draft the record (person, qualification, date taken) with the passage it read, for the safety manager to confirm. The validity date comes from the qualification, and the check at confirmation stays a rule over confirmed records.

Learn more: Plan to produce end to end

All drills · Back to the lab

Sign in to track your progress

We'll email you a one-time sign-in link. No password needed.

or

Tell us a little about you

Optional, every field. It helps us pitch answers to your questions at the right level and decide which topics to write next. It is never shown publicly, and you can change or clear it anytime from the account menu.

SAP areas you work in