The spares that can't leave
What the user reports
Monday 21 December at Rockford. Tamsfield delivered the last ten old impellers CP-IMP200 early, and customer service rechecked Hallam's spare order HFS-PO-7884: all ten confirmed. To make sure nobody orders or plans the old impeller again, the product engineer set its lifecycle status on Friday afternoon. Hallam's truck comes at two.
The error: Delivery for Hallam's spare order HFS-PO-7884 refused on Deliveries and shipping: CP-IMP200 has lifecycle status Obsolete and can't be delivered.
What you'll do
- See the problem as the shipping specialist: On Deliveries and shipping, create the delivery for Hallam's order HFS-PO-7884, pick it and post the goods issue.
- Find the cause: The ten impellers are in stock and confirmed on Hallam's order. Why can't the delivery be created?
- Fix it as the production engineer.
- Prove it: run the step that failed again.
The drill runs in the lab on its own prepared copy of the fictional Calder Pumpworks, saved in this browser apart from your company. All codes and values are fictional course labels.
Answer and explanation (open after the drill)
The fix: CP-IMP200 is Obsolete, and obsolete blocks deliveries too, even of an order already confirmed.
A lifecycle status says what may still happen to a part. Obsolete means nothing new at all: no buying, making, planning, selling or shipping. The engineer meant "no more buying or planning", which is Phase-out: it stops purchase and production orders and MRP proposals, sells only from stock, and still lets confirmed orders ship. The follow-up part only takes effect from 1 February, and the lab doesn't swap parts on an open order.
Why it broke
The engineer picked the strongest status for a part that still had one job left: ten impellers on a confirmed order. Obsolete stops shipping as well as buying, so the spares Calder bought for Hallam sat in RM01 while its truck waited. A status changes nothing already agreed in the books, but it does stop the next step of every open document for that part.
How teams prevent it
Before a status goes to Obsolete, look at what is still open for the part: stock, purchase orders, sales orders and production orders (the lab lists them on Changes and effectivity, under Lifecycle status). A part with open sales orders or stock goes to Phase-out first, and to Obsolete only when the last of it has left.
Across teams
The product engineer owns the status, customer service promised the order, the warehouse can't ship, and Hallam's distributors wait for spares for pumps in the field. One field on the material reached across four teams in one afternoon.
Where AI fits
Listing everything still open for a part before its status changes is plain automation, and it should run every time. A model can draft the run-out note for the engineer (what is open, which status fits, what each choice blocks) from the open documents, but the status change itself stays with a person: it decides what the company still sells.
Learn more: Order to cash end to end